ALDOT Road Conditions http://alitsweb2.dot.state.al.us/RoadConditions/ Road Conditions issued by the Alabama Department of Transportation 2 11791 US 90 Westbound in Mobile County Cochrane Bridge, US-90, Mile Post 32.346, Outside / Right Lane Closure - Fence Replacement on The Cochrane Bridge. Outside / Right Lane Closures Monday Thru Friday 8:30 am - 6:00 pm Until Project Is Complete. - Expected Completion: 4/26/2016 http://alitsweb2.dot.state.al.us/RoadConditions/ Mon, 11 Apr 2016 15:24:41 -0500 11476 I-65 Southbound in Mobile County I-65 at Airport BLVD right lane closer from mile post 5 to 3 starting on 3/6/2016 - Routine Bridge Maintenance, seal installation - Expected Completion: 3/7/2016 http://alitsweb2.dot.state.al.us/RoadConditions/ Fri, 04 Mar 2016 17:20:00 -0500 30.698089 -88.124406 10393 I-10 All in Mobile County Road and bridge work consisting of planing, resurfacing, guardrail, cable guardrail, bridge rail retrofit, weigh station improvements and weigh-in motion station installation from the Mississippi state line to CR 39 (McDonald Road). - Heavy equipment working adjacent to roadway. Delays and lane closures possible. - Expected Completion: 8/15/2017 http://alitsweb2.dot.state.al.us/RoadConditions/ Tue, 12 Jan 2016 11:39:41 -0500 9535 I-10 All in Baldwin County Road work consisting of resurfacing and signal upgrades from east end of Bayway Bridge to east of AL 59, including ramps and side roads. - Heavy equipment working adjacent to roadway. Delays and nighttime lane closures possible. - Expected Completion: 6/15/2016 http://alitsweb2.dot.state.al.us/RoadConditions/ Wed, 07 Oct 2015 11:03:49 -0500 9571 I-65 All in Mobile County Road and bridge work consisting of various repairs to Delta River bridges (BIN 012321, 012322). - Heavy equipment working adjacent to roadway. Delays and lane closures possible. - Expected Completion: 12/15/2016 http://alitsweb2.dot.state.al.us/RoadConditions/ Wed, 07 Oct 2015 10:45:55 -0500 30.907780 -87.980821 9568 I-10 All in Mobile County Road work consisting of welcome center replacement, grade, drain, base and pave, demolition, building, lighting, landscaping, sewer and lagoon removal at the Alabama/Mississippi state line. - Facility will be closed during construction. Heavy equipment working adjacent to roadway. Delays and lane closures possible. - Expected Completion: 5/15/2016 http://alitsweb2.dot.state.al.us/RoadConditions/ Wed, 08 Jul 2015 11:50:34 -0500 30.476709 -88.393245